Building Wrenton - Page 40
July-August 2020
The latest addition to the layout is a GF BR3MT. It was soon put to work with a train of Mk1 suburbans.



It also posed with two other BR Standards



And found itself shunting the yard.




In the next shot it's reversing into the goods yard as an ex-WD heads north.

The brake van is uncoupled before a couple of wagons are collected from the adjacent siding.

Shunting complete, the train leaves.

A sequence shot as Bittern heads a train through the layout.




